Botanist
From Official Wiki of the Renaissance Kingdoms
The botanist's workshop is a choice after your character reached level 25.
To work in the workshop, you need to:
- have the raw materials for the craft in the chest of your home.
- not work somewhere else.
Any of the following gives your character a growing time or production time bonus:
- "Flower grower" or "Nursery Owner" skill (reduces the growing time).
- Intelligence points (reduce the production time from 0 to 20%).
- Predilection virtue of "Self-giving" (reduces the production time from 0 to 9.5%).
Remark :
- At the end of the work, objects produced can be found in the invnetory of your home.
Contents
- 1 Skill tree
- 2 3D workshop
- 3 Possible productions
- 3.1 How To Guide
- 3.2 Basic
- 3.2.1 Bed of hollyhocks
- 3.2.2 Cauldron fireplace
- 3.2.3 Herb chest
- 3.2.4 Measure of beige colouring
- 3.2.5 Measure of black colouring
- 3.2.6 Measure of brown colouring
- 3.2.7 Measure of blue colouring
- 3.2.8 Measure of green colouring
- 3.2.9 Measure of grey colouring
- 3.2.10 Measure of red colouring
- 3.2.11 Measure of turquoise colouring
- 3.2.12 Measure of violet colouring
- 3.2.13 Measure of white colouring
- 3.2.14 Measure of yellow colouring
- 3.2.15 Pot of hollyhocks
- 3.2.16 Trimmed beech
- 3.2.17 Trimmed birch
- 3.2.18 Trimmed bush
- 3.2.19 Trimmed willow
- 4 Growing time
Skill tree
It needs 20 skill points to complete this tree.
3D workshop
Possible productions
How To Guide
These recipes are available only upon reading the corresponding How To Guide.
Bouquet of wild flowers
Bouquet of wild flowers produced 1 Braided ropes needed 1 Bouquets of yarrow needed 3 Bouquets of hollyhocks needed 3 Production Time 12 hours 60 AP
Flowering cumin planter
Flowering cumin planter produced 1 Cumin seeds needed 3 Common shrubs needed 1 Production Time 16 hours ?? AP
Flowering saffron planter
Flowering saffron planter produced 1 Common shrubs needed 1 Saffron stigmas needed 3 Production Time 16 hours ?? AP
Cinnamon planting
Cinnamon planting produced 1 Common shrubs needed 1 Cinnamon sticks needed 3 Production Time 16 hours ?? AP
Basic
The recipes are given for minimal figures and characteristics.
Bed of hollyhocks
Bed of hollyhocks produced 1 Bouquets of hollyhocks needed 3 Production time 6 hours 30 AP
Cauldron fireplace
Cauldron fireplace produced 1 Trimmed bush needed 1 Rustic fire ring needed 1 Dressed stones needed 2 Production time 19 hours 85 AP
Herb chest
Herb chest produced 1 Trimmed bush needed 1 Rustic chest needed 1 Production time 19 hours 85 AP
Measure of beige colouring
Measure of beige colouring produced 1 Measure of white colouring needed 1 Measure of brown colouring needed 1 Production time 1 hour 7 AP
Measure of black colouring
Measures of black colouring produced 3 Willow needed 1 Production time 3 hours 21 AP
Measure of brown colouring
Measures of brown colouring produced 1 3 Beech needed 1 Measure of red colouring needed 1 Measure of green colouring needed 1 Production time 1 hour 3 hours 7 AP 21 AP
Measure of blue colouring
Measure of blue colouring produced 1 Bunch of woad needed 1 Production time 1 hour 7 AP
Measure of green colouring
Measures of green colouring produced 1 3 Carob needed 1 Measure of blue colouring needed 1 Measure of yellow colouring needed 1 Production time 1 hour 3 hours 7 AP 21 AP
Measure of grey colouring
Measure of grey colouring produced 1 Measure of white colouring needed 1 Measure of black colouring needed 1 Production time 1 hour 7 AP
Measure of red colouring
Measures of red colouring produced 1 3 Bunch of madders needed 1 Measure of yellow colouring needed 1 Measure of violet colouring needed 1 Production time 1 hour 3 hours 7 AP 21 AP
Measure of turquoise colouring
Measure of turquoise colouring produced 1 Measure of white colouring needed 1 Measure of blue colouring needed 1 Production time 1 hour 7 AP
Measure of violet colouring
Measures of violet colouring produced 1 3 Bouquet of hollyhocks needed 1 Measure of blue colouring needed 1 Measure of red colouring needed 1 Production time 1 hour 3 hours 7 AP 21 AP
Measure of white colouring
Measures of white colouring produced 3 Birch needed 1 Production time 3 hours 21 AP
Measure of yellow colouring
Measure of yellow colouring produced 1 Bouquet of yarrow needed 1 Production time 1 hour 7 AP
Pot of hollyhocks
Pot of hollyhocks produced 1 Bouquet of hollyhocks needed 1 Plant pot needed 1 Production time 1 hour 5 AP
Trimmed beech
Trimmed beech produced 1 Beech needed 1 Production time 22 hours 100 AP
Trimmed birch
Trimmed birch produced 1 Birch needed 1 Production time 22 hours 100 AP
Trimmed bush
Trimmed bush produced 1 Common shrub needed 1 Production time 9 hours 45 AP
Trimmed willow
Trimmed willow produced 1 Willow needed 1 Production time 22 hours 100 AP
Growing time
Detail of different trees and plants harvested, their growing time and their optimal watering periodicity is given in the culture of the botanist's workshop.